Heat network infrastructure

With optimisation of the length of the heat networks and with investments in the reconstruction of networks the efficiency of the centralized heating networks of the city has been substantially improved during the operation of Liepājas enerģija. The heating network infrastructure has been modernized throughout the city to meet the highest technological, safety and sustainability requirements.

  • Heating network length: 100 km (main heat pipes – 15 km, distribution and indoor heat pipes – 85 km)
  • Investments in the reconstruction of the main heating network : EUR 10.7 million (incl. European Union Cohesion Fund co-financing – EUR 4.3 million)
  • Reconstruction realized: 2010 – 2013

Back

APPLY FOR A CONSULTATION